Updated: long time we have been advertiéndolo. Madrid has a serious problem with pollution, up to the point that, to at least offset by, measures shall be taken to restrict the traffic that starts with the adopted yesterday – reduce the maximum velocity in the M30 to 70 km/h – and continue with the prohibition of parking in the interior of the M30 in Madrid (except residents) that will enter into force for the morning. The next step, even more damning, it would be limit the access to the city centre by odd-even license plate. And it could occur tomorrow, Saturday, if the air quality does not improve, and the contamination status of current does not subside. Why it has taken this measure? What can be the upcoming restrictions if the levels go down?
The protocol of measures for pollution episodes entered into force on 1 march 2015. It is a series of emergency measures, in function of the concentration levels of NO2, provided by the European Directive 2008/50. These measures are based on three levels of action, the Pre-notice, Notice, and Warning. Now we come to the activation of the measures of restriction of the traffic, because during two consecutive days, has exceeded the level of Pre-Warning (two stations of a same area have exceeded 200 micrograms/m3 NO2, or at two stations of the same zone have been exceeded 250 micrograms/m3 during two consecutive hours).
on Thursday, he began to apply the measures of restriction of the traffic Phase 1. That’s supposed to limit the speed on the ring road central Madrid, the M30, to a maximum of 70 km/h. Let us remember that in the greater part of the exterior areas of the M30 the usual limit is 90 km/h. This also limited the speed to a maximum of 70 km/h on all roads of access to Madrid, from the height of the M40.
The situation has not improved, and we are facing three days of Pre-notice or two days ‘ Notice consecutive, with which we entered the Phase 2. In this phase, it is prohibited the parking of vehicles by non-residents, except commercial, in the area BE (that is to say, in the area regulated under O. R. A.) The parking meters in the centre of Madrid will be disconnected. The measure will enter into force as of 6:00. what’s next?
If the situation continues without improvement, and there are three days of Notice followed and we went into the Phase 3, the sabbath will be put in place restricting the access of the central core of Madrid. That is to say, there will be restrictions depending on the parity of fees for access to the interior of the M30.
If the situation continues to not improve, to the point where we entered the Sunday in the level Warning (Stage 4), the restriction according to parity of enrollment will also be extended to the M30, as well as the area that remains in its interior.
In motor: